ezdays 2010 EOY challenge
#11
OK....To prevent the movable section from coming down and "wiggling" a bit, I used 1/4" steel rod pins on the lift-out, and 1/4" brass tubing in the fixed sections into which the pins slide. That way there is NO movement or misalignment once the lift out is in place. I suggest you do something similar to make sure the movable section comes down in the same spot EVERY time. I presume the bridge is pretty well fixed, so look for a way to make the matching track in the fixed section pretty much immovable. The tracks should line up without the need for rail joiners.

Here's a few pics...

An overall view of the lift-out section.
[Image: DSCF2701.jpg]

A view of the supports. They are all glued and screwed in place
[Image: DSCF2702.jpg]

A close-up of the steel pin used at both ends.
[Image: DSCF2703.jpg]

And their corresponding alignment hole.
[Image: DSCF2704.jpg]

A close up of the tracks....No need for rail joiners...
[Image: DSCF2705.jpg]

I hope some of this helps...
Gus (LC&P).
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)