ezdays 2010 EOY challenge
#35
Thanks guys, although the project is done, I still have much to do on the layout, and that includes everything there that you see as brown dirt on both sides of the transition. I plan on some sort of structures there, I just want to get all the trackwork done before I take that on.

The water is two-part epoxy that I dyed a blue-green. The base underneath was painted progressively darker as it got into the deeper areas. The swirls were a result of smoothing out the final coat of epoxy as it dried.
Don (ezdays) Day
Board administrator and
founder of the CANYON STATE RAILROAD
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)