04-24-2011, 11:54 AM
All basic track work has been completed
Track 7 has been removed. The residual ballast and ties will be done tomorrow with a vacuum after soaking with water. Today is a public holiday in Germany and the old robust vacuum is to noisy. I need to remove lots of well glued sand to get an even base for the planned road.
And finally track 6 (the old mainline) has been disconnected from the new mainline and is a lead track only.
Track 7 has been removed. The residual ballast and ties will be done tomorrow with a vacuum after soaking with water. Today is a public holiday in Germany and the old robust vacuum is to noisy. I need to remove lots of well glued sand to get an even base for the planned road.
And finally track 6 (the old mainline) has been disconnected from the new mainline and is a lead track only.
Reinhard