Track cleaning cars.
#1
I just " HATE " Cleaning my track work. Luckily the layout is in a finished basement with a dehumidifier running so it tends to stay pretty clean. I still wanted to make the job as easy as possible, so I used an old trick that is even available in a few commercial forms. I converted two of my basic cabooses into track cleaning cars that can be run with my regular trains. I did this in HO scale but it could be done in any scale.

I choose two nondescript, plain Jane cabooses from my fleet and a Bright Boy and went to work. The first step was to cut the Bright Boy into two pieces[Image: 009.jpg] and drill a few holes into them large enough for some 2-56 screws.
I drilled out the holes so that the screw heads could be recessed into the Bright Boys as not to interfere with any track work,the pads were secured with 2-56 hard ware. I removed the weights from the frames and drilled corresponding holes slightly larger then the screws through them. The assembly looks like this. [Image: 010-1.jpg]

A one ounce weight was drilled out and also secured to the screws with a set of 2-56 nuts. this allows the cleaning pad to float independently from the car. A celling fan weight of about 1/2 ounce was secured over each truck.[Image: 011-1.jpg] This brings the total car weight up to about 3 ounces. The leading edges of the pad were beveled to avoid snags and the edges of the pad were also painted black to help hide them. [Image: 014-1.jpg] On to the track they went [Image: 013.jpg]and a test train was put together. [Image: 012.jpg]Both cars ran fine and cleaned the track in just a pass or two. Thumbsup I really wasn't keeping track of time but I think that the 2 cars took about an hour to complete from start to finish. One plus is that the Bright Boy pads are double sided, so when they wear out I can just flip them over.
 My other car is a locomotive, ARHS restoration crew  
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)