01-10-2016, 02:13 PM
In between hot water heaters leaking and propane heaters not heating I have goe a few things done. The first pic of the two buildings grafted together. I changed out the original small doors on the freight side with larger ones and on the right end (where you can't see it in this picture ) I added the lean-to and changed out the window on the left for a door. The second pic is of the dock. The loading dock is stripwood applied over a block of balsa wood. There are 54 upright pieces 1/8" by 1/4" and 38 pieces on the deck 1/8" by 1/2" and/or 3/4". The ladder is from the junk box and the overall size is 5/8" by 4".
Mike
Sent from my pocket calculator using two tin cans and a string
Sent from my pocket calculator using two tin cans and a string