09-15-2011, 05:46 AM
Thanks Mark! Yes the grade at Topton is around 5% but is on a compound (S) curve so the compensated grade is supposed to be around 7%. They have a feed company at Andrews even now and it takes at least two locos to pull 5 hoppers of feed up it and threeto four if it's raining or snowing. MR did one arrticle on building a two level N scale layout in a spare room/bedroom and at least one article on building the Graham County railroad.
Mike
Sent from my pocket calculator using two tin cans and a string
Sent from my pocket calculator using two tin cans and a string