01-04-2012, 09:26 PM
Well I had to order track from the Hobbyshop, but I was able to find two smaller pieces in my stuff that I was able to put togther to make the curve. Next I plan on doing to wiring which will take a whole two feeders. So if I am able I should have an operating layout by Friday, not much switching but at least I can get the lights to come on in my locomotives.