Unbelievable on u tube
#10
BR60103 Wrote:Is he likely to be on the NMRA convention this year?

Hi BR,

Yes, he is - I saw a couple of dates on their website that corresponded with the convention dates, then jumped to the Grand Rapids Convention website and confirmed it.

White Creek Railroad links of interest:
History
<!-- m --><a class="postlink" href="http://www.whitecreekrr.com/story/default.asp">http://www.whitecreekrr.com/story/default.asp</a><!-- m -->
Track Plan
<!-- m --><a class="postlink" href="http://www.whitecreekrr.com/other/layout.asp">http://www.whitecreekrr.com/other/layout.asp</a><!-- m -->

Grand Rapids NMRA Convention Site (with reference to the railroad)
<!-- m --><a class="postlink" href="http://www.gr2012.org/speciallayouttours.htm">http://www.gr2012.org/speciallayouttours.htm</a><!-- m -->
Relevant text:
Second is the incomparable White Creek Line. Over five miles of 7 1/2″ gauge track set on 125 beautiful acres of woods and water make this the second largest railroad of its kind in the world.

The WCL will also be open all day every day and will be served by shuttle bus only on a two hour schedule as well.

Upon arrival you will be able to tour the yard and shop area then climb aboard one of the many passenger trains that will be running amongst the ongoing freight operations for a 45 minute ride over this spectacular railroad. You’ll travel through tunnels, over bridges and trestles, around lakes and through the woods before returning to Hidden Valley depot.


Lester, thanks for posting the link - I'm more than half certain I'll be attending some component of the convention this year, and this railroad will now be on my list of to-dos.

Loved the stack talk in the videos - didn't mind the viewpoint at all. It was like going on a relaxing train ride. Great scenery and sound!

Favorite points:
  • The stall on the hill (at the end of two or three) - and the engineer giving a pushing a bit with his legs to keep it moving! No documentation on how he got out of that situation; I'm guessing you take the engineer and brakeman off and the "tonnage" would be reduced enough to get to the summit.... 357
    The "running" switch - the engineer dismounts the moving train, strides forward ten feet, throws some points and remounts as the train comes past.
    The civil engineering was impressive.
    In general, it was interesting to see a railroad like this having an "operating session".
Matt Goodman
Columbus, Ohio
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)