Port Able Railway v2.0
#6
I was playing around with the track plan and made some mods. I switched the amount of grade crossings from 3 to 2 and I switched the locations of the building supply & fish Company.

I figured that the curve on the right side of the plan could be used as an interchange track as well as the drill lead for the manufacturing company. The fish company would load their fish from a [aved area (possibly across the parking lot from the fish company) or I might go with a team/transload track.

Any ideas?

[Image: 7048504319_1dcac9db70_b.jpg]
Mike Kieran
Port Able Lines

" If the world were perfect, it wouldn't be " - Yogi Berra.