The Mogollon Railroad
#14
After working on non layout projects such as structures and rolling stock for the better part of 6 months, I am finally back to layout construction. Here, I have begun to install the surface for what will be the "town at the top of the hill". The narrow gauge branch loops around 1 1/2 times to get to the top, 10 vertical inches from where it started. There are still a ton of rails that need to be laid.


Attached Files Image(s)
   
--
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)