06-25-2012, 08:13 PM
I've used the "search" function on the forum but haven't really answered my problem .
On my HO layout-under-construction , I use code 100 Peco track and turnouts . I've recently removed the switch motors for a few reasons ....... would prefer manual control using knobs . The layout is 3'x10' for the first of two sections ( the second 3x10 will be built later ) and is point to point style .
The area of benchwork where I'd prefer to install the control knobs is about 6" LOWER than the turnouts I want to operate .
Any suggestions on how to go about doing this ?
Thanks , Terry
On my HO layout-under-construction , I use code 100 Peco track and turnouts . I've recently removed the switch motors for a few reasons ....... would prefer manual control using knobs . The layout is 3'x10' for the first of two sections ( the second 3x10 will be built later ) and is point to point style .
The area of benchwork where I'd prefer to install the control knobs is about 6" LOWER than the turnouts I want to operate .
Any suggestions on how to go about doing this ?
Thanks , Terry
To err is human, to blame it on somebody else shows management potential.