Ngauger's 2013 Duff Challenge
#14
doctorwayne Wrote:
Sumpter250 Wrote:" until I begin building it and redesign it as I go "

Eek Eek Eek You say that as if it were NOT the usual accepted procedure !!!! Wink

:cry: :oops: Have I been so wrong all these years :o :?: :?: :oops: Icon_twisted Icon_twisted Icon_twisted 357 357

That's why I seldom bother with a formal plan - eliminating that step saves a lot of time. Misngth Misngth


Wayne
FIVE Minutes!!!!!!

Just 5 minutes into the construction phase, I realized that I had not measured the new (GERN Coal) clearance under the plant Eek

The "plans" showed 7" tall... the clearance is only 6" :oops:

So a quick cut and tape of the plans and we're at 5.5" height Smile Smile Smile

Now that the outside temperature has started creeping up to 25 from 9 Sad... the heater in my shop (garage) is actually keeping it around 55 Smile Not too bad to work in.
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75    
~~ Baldwin Eddystone Unofficial Website

~~ I wonder what that would look like in 1:20.3???
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: