East Terminal & Newburgh
#56
Hello,

next module which went into the shop was module #2.

[Image: dsc02386o9skd.jpg]
So it looks as hitherto. The tree is temporary lose put.




[Image: dsc01003jaekv.jpg]
Spreath & Cie. Zinc Smelter was reworked. This group of buildings is removeable, so all fixings has to be made onto the biuldings.
At first the handrails of the stairs were made out of brass wire. Brass because the former handrails out of plastic were prone to break off and did this very often; too often in my opinion.
Then some brush was added and fixed onto the buildings wall.
A little awning was made and detachable mounted. This can only be used in the steam and tansition eras. Modern cars are too high und too big to pass here.
A good visible company signboard was made and pemanently fixed.




[Image: dsc01004jnf0z.jpg]
First signs of messiness was spotted on the truck loading dock.




[Image: dsc01006jwi8d.jpg]
A new (left) and a repaired switch stand. The left one was beyond repair and was replaced by an new switch stand.
The right one was repaired by a somewhat corset made out of 0.3mm bronze wire to stabilize the weak pewter frame.




[Image: dsc01007fidao.jpg]
And overall some more shrub green was added.


[OT]
The crane in the background is a good model to attract attention. So in conclusion with a sign with clear readable:

Plywood District
Industrial Area
Development Site




Lutz
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)