East Terminal & Newburgh
#61
Hello,

[Image: dsc0115985jqn.jpg]
Work started with removing the pile of ballast which has until now served asa wheelstop. Fortunately the PVAC glue i used then is water soluble.




Meanwile the silos were built:
[Image: dsc010951zjjl.jpg]

[Image: dsc01096rqkda.jpg]

[Image: dsc010970vjzz.jpg]
Some devices for subsurface pipework was added.

[Image: dsc01098nqjn3.jpg]

[Image: dsc01099j3jxi.jpg]
The compressor shack has to be placed at the side due to space restrictions. Therefor some pipework has to be altered and retrofitted.




[Image: dsc011605ek7x.jpg]
A piece of flextrack was lose laid.




[Image: dsc01161fyj85.jpg]
And the plant too to get an impression what it looks alike. Also to determine if the elongated track fits.

The the track was nailed down.


Lutz
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)