East Terminal & Newburgh
#92
Hello,

the public premiere was then at the SWD meeting in Ubstadt 2019:

[Image: dsc02162fhj1f.jpg]
The tracks were ballasted and weathered.




[Image: dsc02170u9ksu.jpg]
The module Flats Extension from above.




[Image: dsc021719zkqi.jpg]
Detail photo of switch and transition to module #5.




[Image: dsc02172gfjtp.jpg]
Detail photo of legs and leg holder. The legs are 2cm x 2cm wood profile and the leg holders are made out of aluminium square tubes with inner measures of 2,2cm x 2,2cm. 




[Image: dsc02173jpklp.jpg]
Detail of switch actuator.




[Image: dsc02174h0kns.jpg]
The whole switch actuator. There is a push-pull rod which which a) actuates the electrical double toggle switch and b) by the means of the rocker both switches simultaneousley. Also both frogs are juiced with the correct polarity.




[Image: dsc021630aksx.jpg]
The first presenting of the plastic pellet facility in public.




[Image: dsc02168zekzu.jpg]
The new refrigerated warehouse of Flats Cold Storage.


Lutz
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)