02-18-2013, 03:23 AM
After the break of several months it was time to make some prgress on the layout.
Again a control photo. I use such photos to detect flaws under the harsh conditions of flashlight. Here some cosmetical work has still to be done before mounting the switch stand.
The next modified Details West switch stand mounted. The little bend in the linkage rod allows to make a fine adjustement the tablet does eaxct the 90° movement.
In the back of module #5 there a warehouse was rised. This was made out of Walthers modular brick walls.
Initially this building had an peaked roof. Later, after a fire, it was replaced by an flat roof.
Lutz
Again a control photo. I use such photos to detect flaws under the harsh conditions of flashlight. Here some cosmetical work has still to be done before mounting the switch stand.
The next modified Details West switch stand mounted. The little bend in the linkage rod allows to make a fine adjustement the tablet does eaxct the 90° movement.
In the back of module #5 there a warehouse was rised. This was made out of Walthers modular brick walls.
Initially this building had an peaked roof. Later, after a fire, it was replaced by an flat roof.
Lutz