CNJ I-4 and I-5 Consolidation camelbacks
#13
Don't have a photo now, but the I4, 2-8-0 boiler is done again for the 4th time. This was to be a build 2 of the same type, and were to be 2 I5 class. Well a I4 is the other model. A little smaller loco. Not have a good time building this pair of camelbacks. Now that the summer and the hot weather is over I'll be up in the attic working on this project again.
frank
" It's a Heck of a Day " !!!!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)