CNJ I-4 and I-5 Consolidation camelbacks
#9
Sumpter250 Wrote:You and me both Wink Big Grin Big Grin Big Grin Thumbsup Thumbsup Thumbsup I can't even dance as gracefully as you two "stumble" :o Wink

** If you had read my ongoing strugle to make the darn camels, ( not here on the gague) you would understand why I say, strugle. This thing started on June 12 2012. I only thing I have proved is perserverance. They were to be a pair of Reading I-6 class 2-8-0c. After about 4 months I found nothing working when trying to build as Reading type camels. To many concessions to too smaller a proto boilered loco. I changed to the bigger boilered CNJ I-4 and I-5 class. Still strugling. On the I-5, I am on my fourth cab, and third firebox. I have been making up tricks all along the way to improve the final look. Cant wait to see what will happen next. It is like a Flash Gorden serial.
frank
" It's a Heck of a Day " !!!!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)