Madras Switching Layout HO Scale
#2
I started construction on the modules on the 21st of April and completed the basic modules on the 22nd of April. I now need to transpose the track plan to the plywood top and start gluing down cork. I will use HO scale for the mainline and N-scale cork for the rest of the tracks. I plan on using all Micro Engineering #6 switches and ME code 83 rail.

[Image: Madras%2B1.jpg]

[Image: Madras%2B6.jpg]

[Image: Madras%2B9.jpg]
Be Wise Beware Be Safe
"Mountain Goat" Greg


https://www.facebook.com/mountaingoatgreg/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)