05-16-2015, 09:28 PM
Not that exiting, but I did get cork laid out.
Next step will be to paint the cork and the top of the exposed wood on the layout. The plan will be to use Micro Engineering code 83 Flex for the mainline and CVMW tie strips and ME code 83 rail for all other tracks. The switches will be ME #6 controlled by blue point switch machines. I plan to be able to operate the switched from both sides of the layout. The plan will be to have the layout operational by June 1st.
Next step will be to paint the cork and the top of the exposed wood on the layout. The plan will be to use Micro Engineering code 83 Flex for the mainline and CVMW tie strips and ME code 83 rail for all other tracks. The switches will be ME #6 controlled by blue point switch machines. I plan to be able to operate the switched from both sides of the layout. The plan will be to have the layout operational by June 1st.