05-18-2015, 06:05 PM
After I got the cork laid out I proceed to paint the cork and the top of the layout.
Once the paint dried I started laying out the main track, which is ME code 83 and figuring out how the crossover was going to fit in. I also cut and secured some of the CVMW tie strips along the track going to H.S. Michaels.
Once the paint dried I started laying out the main track, which is ME code 83 and figuring out how the crossover was going to fit in. I also cut and secured some of the CVMW tie strips along the track going to H.S. Michaels.