E-paw's Get off yer duff Challenge - Part I
#10
The spring replaced and a quick check with a coupler gauge shows all to be good.
   
   

With that out of the way I soldered a 9 1/2 in single stage compressor to it's bracket and mounted it to the fireman's side of the boiler.
   
   

And after I posted this I realized that I didn't take any pics of building the cab roof . :o As you can see in the last two pics,, it has been built and installed. It's more of the same styrene embossed with rivets. It has two vent hatches and a dummy hatch that provides access to the steam dome for maintenance.
 My other car is a locomotive, ARHS restoration crew  
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)