West Allen Street & Thawne
#4
Following on from the post yesterday, here are some work in progress photos of the next extension to the layout.

It will fix onto the end of the inglenook part of the layout, to the middle spur which feeds the loading dock for the Handy Co. Metals factory.

The spur that feeds the travelling crane will be where the Handy Co. load/unload larger cargo, as well as a gravelled "team track" for them to unload various other components.

The front spur feeds a coal unloading trestle and general merchant which are a seperate industry to Handy Co.

The switch is hand built, although probably not very well - it's only the third switch I've made, though the second one was the 3 way that replaced the sector plate on the extended layout.

[Image: FB_IMG_1483544943348_zpsjketgtnm.jpg]

[Image: FB_IMG_1483544856767_zpsxyqsc6cw.jpg]

[Image: FB_IMG_1483544838085_zps9jfnje7p.jpg]

[Image: FB_IMG_1482648173088_zpslvh5wpd3.jpg]

[Image: FB_IMG_1482648145229_zpsurkezvte.jpg]

[Image: FB_IMG_1482648155273_zpsany26ou7.jpg]




Last of all, here is the general plan for Ramon Blvd, the next expansion which will project from the current locomotive stabling spur on the front of Thawne.

[Image: FB_IMG_1483544870445_zpspqwdwoma.jpg]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)