07-19-2018, 09:30 AM
Some more construction pics of the brewery.
The door frames cut out from cardboard:
The painted doors:
Primed windows:
Painted windows with green acrylics:
Real glass cut to size with a diamond scribe:
The buildings foundation:
Loading docks:
The water tank:
The door frames cut out from cardboard:
The painted doors:
Primed windows:
Painted windows with green acrylics:
Real glass cut to size with a diamond scribe:
The buildings foundation:
Loading docks:
The water tank: