Brooklyn 1st Ave waterfront
Been a while since my last post but I've been getting a few things done.
The cobblestone street is painted and weathered with a wash. The carfloat is painted and wired with track power. I was messing around a bit with ground cover. Also experimented with Lego garage door kits for the roll up doors for Franklin Polymers and Atlantic Waste.
[Image: 20181117_204051_zpsd9ocrdj3.jpg]
[Image: 20181113_000148_zpsefovoony.jpg]
[Image: 20181108_101442_zpsuy3kestm.jpg]
[Image: 20181201_101131_zpsitfcswq4.jpg]
[Image: 20181201_105945_zps0svb3aqc.jpg]
[Image: 20181201_105320_zpsdlvjjshn.jpg]
[Image: 20181201_131149_zps8axfs1ih.jpg]
[Image: 20181201_131935_zpsapacxjp2.jpg]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)