12-06-2017, 11:24 AM
First structure is on it's way. It is about a half Cornerstone "Lakeville Warehouse" kit (933-2917) and it needs some weathering.
The other half of the kit will form another warehouse to be built soon.
Weathered with black wash and light gray dry brush on the blue parts. The dry brush was to wet and I rubbed the blue part with alcohol. That resulted in a nice ruined surface.
The other half of the kit will form another warehouse to be built soon.
Weathered with black wash and light gray dry brush on the blue parts. The dry brush was to wet and I rubbed the blue part with alcohol. That resulted in a nice ruined surface.
Reinhard