Playing with the switches on top of the existing layout to make my mind of a track plan. This time only #6 switches.
A run through mainline with seven diverging tracks to the south and one parallel track at the north. The very foreground will be running through road. At both end is a 90° curve leading over hatched to the staging yard on the other side of the room.
Three industry tracks on the east side
Four industry tracks on the west side
A run through mainline with seven diverging tracks to the south and one parallel track at the north. The very foreground will be running through road. At both end is a 90° curve leading over hatched to the staging yard on the other side of the room.
Three industry tracks on the east side
Four industry tracks on the west side