Freelance 2018-1
#8
Playing with the switches on top of the existing layout to make my mind of a track plan. This time only #6 switches.

A run through mainline with seven diverging tracks to the south and one parallel track at the north. The very foreground will be running through road. At both end is a 90° curve leading over hatched to the staging yard on the other side of the room.

Three industry tracks on the east side
[Image: 40249184391_349338fcdd_c.jpg]

Four industry tracks on the west side
[Image: 39351472815_8c11253b6f_c.jpg]
Reinhard
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 3 Guest(s)