Weekly Photo Fun 4/27 - 5/3/18
#11
ePaw:
our campsite is just up the waterway beside the terminal. Unfortunately, it's also across the waterway from the terminal.
(we're not there)
DrWayne: do we really need to know what the loads are that we're modelling?
(this post will be re-assigned to the Model Railroading Pilosophy thread)
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)