01-30-2019, 08:48 AM
You are kidding me aren't you.
I love the thumbtacks for temporary track laying during planning. The spring in the Peco switches permit full test operation at this very early stage of planning. That is very convenient.
I had to move the most right switch due to limited under floor space for switch machine installation.
ps. I have an iPad and a MacBook Air. Are those valid "books" too?
I love the thumbtacks for temporary track laying during planning. The spring in the Peco switches permit full test operation at this very early stage of planning. That is very convenient.
I had to move the most right switch due to limited under floor space for switch machine installation.
ps. I have an iPad and a MacBook Air. Are those valid "books" too?
Reinhard