11-10-2021, 10:59 PM
I finally found the time to work again on the layout.
I placed the foam roadbed in the area where I am going to do scenery. I laid the track back over the roadbed to make sure everything fits.
Looking the other way.
I am using Woodland Scenics foam roadbed. I will eventually cut around the turnouts when I finalize those areas. Where there is no paint the roadbed is temporary,
Using Woodland Scenics transition sections I added 2% temporary transitions from the foam board to the foam roadbed.
Test trains have been successfully run through the section. I plan on doing one or two run by trains. After that I will glue the roadbed in place in the area where the passenger station will go.
I placed the foam roadbed in the area where I am going to do scenery. I laid the track back over the roadbed to make sure everything fits.
Looking the other way.
I am using Woodland Scenics foam roadbed. I will eventually cut around the turnouts when I finalize those areas. Where there is no paint the roadbed is temporary,
Using Woodland Scenics transition sections I added 2% temporary transitions from the foam board to the foam roadbed.
Test trains have been successfully run through the section. I plan on doing one or two run by trains. After that I will glue the roadbed in place in the area where the passenger station will go.
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery