12-30-2021, 10:19 PM
Thanks guys!
As I stated I am returning to the original track plan. There are some minor changes due to either the unavailability of track or what will work. The plan called for a siding for the Northern Power & Light plant. I followed the plan as close as I could but since I don't have any 15 inch radius curved track I had to use all 18 inch.
I am thinking about moving the wye so I can install longer storage tracks.
Here is a video of the delivery.
https://youtu.be/dr_3PyZCqi4
As I stated I am returning to the original track plan. There are some minor changes due to either the unavailability of track or what will work. The plan called for a siding for the Northern Power & Light plant. I followed the plan as close as I could but since I don't have any 15 inch radius curved track I had to use all 18 inch.
I am thinking about moving the wye so I can install longer storage tracks.
Here is a video of the delivery.
https://youtu.be/dr_3PyZCqi4
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery