01-23-2022, 11:53 PM
Be prepared for a lot of photos as I had a really good weekend.
It started with putting down the roadbed for the inside track. At the Water Tower Diorama because there were switches near a portion on the outside track was done.
Going around the curve.
Next I decided to glue down some roadbed and track. I had to do both because flex track was involved and I needed the track to keep the roadbed aligned.
I also determined what I could put in this corner. It is the O. L. King Coal Dealer. I made cardboard cut outs of the buildings. I do need the kit to determine the height of the coal trestle and thus what grade will be required.
Here is a photo of the kit. I am waiting for the kit to arrive. It was supposed to be here on Friday but has been delayed.
It started with putting down the roadbed for the inside track. At the Water Tower Diorama because there were switches near a portion on the outside track was done.
Going around the curve.
Next I decided to glue down some roadbed and track. I had to do both because flex track was involved and I needed the track to keep the roadbed aligned.
I also determined what I could put in this corner. It is the O. L. King Coal Dealer. I made cardboard cut outs of the buildings. I do need the kit to determine the height of the coal trestle and thus what grade will be required.
Here is a photo of the kit. I am waiting for the kit to arrive. It was supposed to be here on Friday but has been delayed.
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery