I purchased the rail joiners, so I guess I'll start with them:
The center package is the rail clamps that need to be installed.
There are a bunch of the standard Aristo joiners on the layout that need to be replaced.
For example:
The top line is the main and was done about 3 years ago.
The lower line is the trolley line that I want to update.
The right line is the updated area, the left is what i need to remove. This section is about 10 ft. long under a 5ft tunnel.
The center package is the rail clamps that need to be installed.
There are a bunch of the standard Aristo joiners on the layout that need to be replaced.
For example:
The top line is the main and was done about 3 years ago.
The lower line is the trolley line that I want to update.
The right line is the updated area, the left is what i need to remove. This section is about 10 ft. long under a 5ft tunnel.
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???