two question: Operation and turnout?
#1
Operation question:
I just got through reading an aritcal in MR March 2007 which the auther states on page 51:
"Once the crew has finished switching the line, they must turn the train at Puget Mills (the loop track back to the yard is off limits) for its return trip to Tacoma."
Without a turn table or a wye, how do you turn a train on this layout?
   
Second question is about installing a Walther #6 double crossover turnout.
I can see no reason that I would not want all turnouts to either line up for stright through (dual track operation) or all turnouts lined up for crossover operation. Therefore I think that I would like one machine to use some linkage to align all four turnouts at the same time.
Anyone done this before? If so pictures and direction about the linkage would be nice to see. Or is there a problem with doing this?

Kent
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)