12-03-2022, 01:47 PM
Now that I've done some last minute touchups, it's time to lay down the Realistic Water. There are always leaks and gaps, and because I have a carpeted office, I need to take a few precautions. The drop cloth got draped under Mud Run and I did my first pour from the backside of the bridge into the Lehigh. I'll let this dry and harden up before deciding where the next pour will be - probably from the uphill portion of the Lehigh tomorrow.
Check out my "Rainbows in the Gorge" website: http://morristhemoosetm.wixsite.com/rainbows