06-04-2023, 01:40 PM
I tweaked the base's design a bit. I wanted a creek to run under it so I had the make and allowance for that. I also noticed that the ends:
Of the base are higher than the trestle itself. If this does eventually get incorporated into, say a free-mo module, I need to make it as easy as possible.
So I added another 1/2" piece of plywood to the bottom to lift the trestle up just a bit to accommodate both of these 'wants'.
So this lifts the ends of the trestle so the ties are above the framework.
and I was able to cut a creekbed into the plywood below.
Of the base are higher than the trestle itself. If this does eventually get incorporated into, say a free-mo module, I need to make it as easy as possible.
So I added another 1/2" piece of plywood to the bottom to lift the trestle up just a bit to accommodate both of these 'wants'.
So this lifts the ends of the trestle so the ties are above the framework.
and I was able to cut a creekbed into the plywood below.