06-21-2009, 11:52 AM
Dang Mike, moving right along. Nice job, now I'm not sure what to do next on mine. :?:
Joe
Joe
ACTRR is being dismantled and re-constructed
|
06-21-2009, 11:52 AM
Dang Mike, moving right along. Nice job, now I'm not sure what to do next on mine. :?:
Joe
07-04-2009, 10:06 AM
Well , here is what the final plan turned out to be. The track is all in and wired up and pinned down in final position. I will try to post Video #4 later today as well.
Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-04-2009, 11:20 AM
cool! I like it.
Reminded me that I need to put a reversing section into my layout as well!
-------------------------------------
-Luke <!-- m --><a class="postlink" href="http://greatfallsrr.blogspot.com/">http://greatfallsrr.blogspot.com/</a><!-- m --> http://www.the-gauge.net/forum/viewtopic...212#p15212 = Traction of the Pacific South Eastern
07-04-2009, 01:51 PM
Thanks Luke.
Ok guys , here is the fourth installment of the ACTRR re-build. Hope you all enjoy. <!-- m --><a class="postlink" href="http://www.youtube.com/watch?v=CHamakutbeQ">http://www.youtube.com/watch?v=CHamakutbeQ</a><!-- m --> Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-05-2009, 10:21 PM
Here are some shots of the complete tunnel (facing into the garage). All I heed to do is have a frame and glass made and hang it over the opening. The interior of the tunnel was sprayed (over plaster) with Dupli-color truck bed liner spray and then gray tones were dabbed on and later drybrushed with very light gray. Then the rails were painted with Flo-quil paint pen and roadbead was washed with very thinned black wash. Tracks were cleaned and the trains run great through it.
Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-05-2009, 10:35 PM
Here is my second post this evening. It shows the re-construction of the control panel and how the Kato turnout controls will be laid out.
The 1 on the far left is the two turnouts for the reversing section , the next for to the right are for the four double crossovers and the next 8 are for the yard leads . All other turnouts will be operated by hand and are all on secondary tracks. The leadge on the back of the right side will hold the power supply for the Lenz set-100. Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-06-2009, 04:37 PM
wow those switch controls are freakin huge!
but the ease of hookup must be fantastic! This is really inspiring for me to use Kato track on my next layout. Keep it coming Mike! Your progress is fantastic!
-------------------------------------
-Luke <!-- m --><a class="postlink" href="http://greatfallsrr.blogspot.com/">http://greatfallsrr.blogspot.com/</a><!-- m --> http://www.the-gauge.net/forum/viewtopic...212#p15212 = Traction of the Pacific South Eastern
07-06-2009, 05:05 PM
Thanks Luke , I am really havin fun!
Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-07-2009, 09:11 PM
Here is tonights progress on the toggle switch portion of the control panel. It will also have the turnouts , reverse loop and double crossovers numbered on it.
I tape a generic plan to the back of plexi and then liquid glue .30 X .30 styrene to the plexi , over the plan. Later the holes will be cut and the panel painted , then the lines will be painted with a few paint pens. Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-07-2009, 09:24 PM
Wow..!!! You're going like a house a' fire....!!! Is this a full-time job..?? How much does it pay..??
Love that peek-a-boo tunnel...Looks great..!!
Gus (LC&P).
07-07-2009, 09:33 PM
Steamtrains Wrote:Wow..!!! You're going like a house a' fire....!!! Is this a full-time job..?? How much does it pay..??Thanks Gus , no it is my third job actually and it is the one that does not pay!! Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-11-2009, 07:59 PM
I did some wiring removal and wiring ID and labeling today and got the panel to this stage.
Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin
07-11-2009, 08:18 PM
That control panel looks great!
Is there any special wiring involved on those double crossovers?
Scott
07-11-2009, 08:21 PM
A colored control panel - that's a stoke of genius.
Great progress...wish my layout was that far along...great job!
Mark
Citation Latitude Captain --and-- Lt Colonel, USAF (Retired)
07-11-2009, 08:49 PM
Thanks Herc !
Scott , no there is no fancy wiring just 2 wires and on throw throws all four points. They work like a champ. Thanks Mike Everyone wants to go to heaven , just not right now .
Fifer Hobby Supply http://www.fiferhobby.com/ Mike & Robin |
« Next Oldest | Next Newest »
|