02-01-2016, 09:00 PM
Coal and Steel Railroad op session on Sunday with Bill and David. They came over and we ran most of the trains.
Note; The car movement cards work. There are two more things I need to improve on my layout.
1. Job card
2. Standardize switch controls.
pictures of the op sessions here <!-- m --><a class="postlink" href="http://model-railroad-hobbyist.com/node/25283">http://model-railroad-hobbyist.com/node/25283</a><!-- m -->
Note; The car movement cards work. There are two more things I need to improve on my layout.
1. Job card
2. Standardize switch controls.
pictures of the op sessions here <!-- m --><a class="postlink" href="http://model-railroad-hobbyist.com/node/25283">http://model-railroad-hobbyist.com/node/25283</a><!-- m -->