04-12-2016, 09:57 PM
Thank you Sir
I do plan to 'plant' it on my layout soon.
Anyway here is where it will go:
It will be replacing the mine structure behind the logging train. However it will require quite a bit more real estate than the current structure so I'm taking the entire mountain side/rock face down so I can build new scenery to suit. Not sure what I'll do with the old mine yet.
One more thing this arrived in the mail yesterday:
I hope that I bought enough, if not I'll use this on the front slopes and I have some leftover bit of roofing that I can use on the backs. Anyway since the roofing material is rather fragile, I think I'll start to fit the structure into the layout before adding it.
I do plan to 'plant' it on my layout soon.
Anyway here is where it will go:
It will be replacing the mine structure behind the logging train. However it will require quite a bit more real estate than the current structure so I'm taking the entire mountain side/rock face down so I can build new scenery to suit. Not sure what I'll do with the old mine yet.
One more thing this arrived in the mail yesterday:
I hope that I bought enough, if not I'll use this on the front slopes and I have some leftover bit of roofing that I can use on the backs. Anyway since the roofing material is rather fragile, I think I'll start to fit the structure into the layout before adding it.