02-13-2019, 11:59 AM
Preparing the ballasting and ground cover application by excluding all streets, buildings, loading docks etc. with a thin foam layer. The delicate paper laminated buildings will be removed while the ground cover is applied around their foam socket with lots of water.
Reinhard