01-11-2015, 06:46 PM
The FA-2 has been moved inside and work has started on the restoration. The "B' will be moved indoors soon also so that work can resume on that as well. The Baldwin shop switcher is also nearing completion, and we have received a new toy in the form of an SW-1 built back in 1939.
The 0-6-0 has passed it boiler tests , soon she will be pulling the yard shuttle around Scranton.
514 will spend the winter getting a little TLC , the hood was removed to make this a bunch easer.
And here in the new addition to the fleet.
The 0-6-0 has passed it boiler tests , soon she will be pulling the yard shuttle around Scranton.
514 will spend the winter getting a little TLC , the hood was removed to make this a bunch easer.
And here in the new addition to the fleet.
My other car is a locomotive, ARHS restoration crew