N-Gauger's 2020 one foot challenge
#45
I worked a bit last night and finished most of what I set out to do.
  • Design building - Done
  • Draw building - Done 
  • Decide on materials to build structure - (Paint sticks and spare pieces of lumber) - Done
  • Build structure - Done
  • Add the tracks inside the shed - Done
  • Isolate the 2 tracks electrically and connect "power lead" switches so both engines don't come out at the same time Eek - Done
  • Add switches to layout - Done
These will be added later:
Connect air tubes and toggles to operate switch machines 
Add position LED lights to switch frogs 
Light building - More LED's

Floor details (tools, work benches etc) - No room for floor details  Sad  Nope Nope


Attached Files Image(s)
   
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75    
~~ Baldwin Eddystone Unofficial Website

~~ I wonder what that would look like in 1:20.3???
Reply


Messages In This Thread
N-Gauger's 2020 one foot challenge - by ngauger - 02-23-2020, 07:34 PM
RE: N-Gauger's 2020 one foot challenge - by ngauger - 04-30-2020, 05:47 PM

Forum Jump:


Users browsing this thread: 2 Guest(s)