02-29-2020, 08:24 AM
This area is where the Murphy depot goes. I built the depot a long time ago but never have installed it and finished the area. There is also a half built Southern RR maintenance shed that needs to be finished to go in this area as well. The stuff along the backdrop will probably stay as you see it. At 10.5" from front to back and 12" side to side it comes in under the wire at 126 sq." of the 144 sq." allotted. This of course is in the correct scale of N.
Mike
Sent from my pocket calculator using two tin cans and a string
Sent from my pocket calculator using two tin cans and a string