03-02-2021, 04:23 PM
I finished laying down the outer loop of the track plan. I also did some test runs with a Atlas S-2 and a Bachmann Spectrum 4-8-2. I tested both with a Walthers Heavyweight car. Next will be laying down some of the inner loop. I am waiting for a track order to be delivered so I can finish the inner loop. I plan to tack down the track and outline the track zone. After that will be laying the roadbed.
Video of a test run with NYO&W Bachmann Spectrum Light Mountain 4-8-2 alone.
https://youtu.be/xiFYRd_K3Tk
Video of a test run with NYO&W Bachmann Spectrum Light Mountain 4-8-2 with a Walthers B&O Heavyweight Diner.
https://youtu.be/wE1EqJM_nNY
Video of a test run with NYO&W Bachmann Spectrum Light Mountain 4-8-2 alone.
https://youtu.be/xiFYRd_K3Tk
Video of a test run with NYO&W Bachmann Spectrum Light Mountain 4-8-2 with a Walthers B&O Heavyweight Diner.
https://youtu.be/wE1EqJM_nNY
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery