04-04-2022, 03:56 PM
Thanks for the encouraging words.
I am in the process of adding rail joiner feeders and connecting them to the bus lines. Thus far I have the bus line for the inside track westside of the layout ran. I have dropped five feeds on the inside track and plan to add one more. However, in order to add the next group of feeders I needed to lay the roadbed and track. I added switches to the outside track for the future extension.
This is what it looks like..
The plan is to keep adding feeders and connecting them to the bus lines. I have a circuit breaker to add the bus lines. I plan to have six blocks, two for each track.
I am in the process of adding rail joiner feeders and connecting them to the bus lines. Thus far I have the bus line for the inside track westside of the layout ran. I have dropped five feeds on the inside track and plan to add one more. However, in order to add the next group of feeders I needed to lay the roadbed and track. I added switches to the outside track for the future extension.
This is what it looks like..
The plan is to keep adding feeders and connecting them to the bus lines. I have a circuit breaker to add the bus lines. I plan to have six blocks, two for each track.
Tom
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery
Silence is golden but Duct tape is silver
Ridley Keystone & Mountain Railroad
My Rail Images Gallery