02-21-2023, 07:47 PM
Adjusted some of the riverbed tonight with a pallet of greens and browns - I have to detail the rocks prior to pouring Realistic Water.
In the meantime, I've installed my dam - a blue tarp that I secured up against the edge of the layout with a few screws into a piece of scab plywood, and worked under the supports and secured using the grommets of the tarp. If I do get some drips, the tarp will keep the polyurethane from setting up in my carpet. I also ran a bead of silicone between the tarp and the riverbed. Eventually there will be a piece of fascia at the edge of the river.
In the meantime, I've installed my dam - a blue tarp that I secured up against the edge of the layout with a few screws into a piece of scab plywood, and worked under the supports and secured using the grommets of the tarp. If I do get some drips, the tarp will keep the polyurethane from setting up in my carpet. I also ran a bead of silicone between the tarp and the riverbed. Eventually there will be a piece of fascia at the edge of the river.
Check out my "Rainbows in the Gorge" website: http://morristhemoosetm.wixsite.com/rainbows