Posts: 154
Threads: 10
Joined: Feb 2010
The 642 brings the empty hoppers off the non-electrified line from the low level sidings onto the main line
...and arrives in the station where an electric loco is waiting to take the train onwards
The Duro leaves the hoppers and the 189 takes over
the 189 departs....
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 154
Threads: 10
Joined: Feb 2010
....and after a circuit of the layout, arrives in the freight loop
where it leaves the hoppers for shunting
The Kamnolom Anderslej shunter pushes the hoppers towards the loader
Three wagons are placed in the far track
and the other three pushed under the loading shute
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 154
Threads: 10
Joined: Feb 2010
when the first three are loaded, the others are collected and loaded
after running round, the loaded train is pushed into the siding for collection by an electric locomotive
then the 189 couples ready for the return run
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 154
Threads: 10
Joined: Feb 2010
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 1,639
Threads: 87
Joined: Dec 2008
Very nice sir.I like those hoppers,and the Duro looks like it would make an easy US Gen Set conversion.
Rest of the layout is looking fine too. :mrgreen:
Johnathan (Catt) Edwards
"The Ol Furrball"
"I'm old school,I still believe in respect"
Posts: 5,263
Threads: 195
Joined: Apr 2009
That is a great operating layout.
Reinhard
Posts: 154
Threads: 10
Joined: Feb 2010
Thanks guys. I had an operating stone loader on a previous Belgian layout which I showed at various exhibitions. Viewing public loved the operation, so I was determined to have one on this layout.
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 4,161
Threads: 174
Joined: Dec 2008
Thanks for letting us ride along! I like the operations scheme!
Ralph
Posts: 5,859
Threads: 175
Joined: Dec 2008
with Ralph, and it's always nice to have an operating scheme where you can actually see the movement of the commodity, from supplying the empties, to loading, and then delivery to the final destination. Thanks for the ride.
Wayne
Posts: 5,201
Threads: 101
Joined: Dec 2008
Very impressive Alan---a wonderful combination of great modelling,photography and operational possibilities
Posts: 154
Threads: 10
Joined: Feb 2010
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 5,263
Threads: 195
Joined: Apr 2009
That is really great. I am impressed how realistic and controlled the cars are filled. The complex mechanic of the conveyor belt makes the difference
Reinhard
Posts: 2,973
Threads: 159
Joined: Dec 2008
Nicely done. And, you inadvertently answered one of my questions about electrified railroads in europe - whether industries had overhead wires or they needed a diesel to switch cars.
--
Kevin
Check out my Shapeways creations!
3-d printed items in HO/HOn3 and more!
<!-- m --><a class="postlink" href="https://www.shapeways.com/shops/kevin-s-model-train-detail-parts">https://www.shapeways.com/shops/kevin-s ... tail-parts</a><!-- m -->
Posts: 154
Threads: 10
Joined: Feb 2010
Kevin, on the stone loaders I used as a prototype to copy, the tracks had catenary, but this would obviously not be under the loaders and would finish before them. So locomotives could not go beneath the loaders, except for diesels, of course. For simplicity I made my loader tracks diesel worked only.
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->
Posts: 154
Threads: 10
Joined: Feb 2010
Just checked photographs of the loaders at Verd, and the catenary terminates well short of them, so they are diesel worked and trains then placed in electrified sidings for collection by electric locomotives.
Alan Curtis
<!-- m --><a class="postlink" href="http://www.andersley.co.uk">http://www.andersley.co.uk</a><!-- m -->
<!-- m --><a class="postlink" href="http://alansgallery.fotopic.net/">http://alansgallery.fotopic.net/</a><!-- m -->