Well, I did the wiring on the lift outs today, though horrendous looking... , they work ABSOLUTELY PERFECT!!!
My UP executive train is really picky on track work, so I ran that on the outside track, and my WSOR engines with a mixed load of my very picky freight cars on the inside track, WOW, they BOTH ran around the layout WITHOUT FAIL!
I should have taken pics of the event, but of coarse I didnt even think about it until I started running other stuff , at least now I can run trains again, YEAH! Now I can get back to my 1000 other projects the layout needs done. Not sure what I will start with, I have so many engines and cars that need couplers replaced, light bulbs replaced, hand rails fixed, sunshades put back on, ect. , OR, I might start building scenery stuff, like billboards, etc. , so much to do .
A couple pics from today...
Till next time....
My UP executive train is really picky on track work, so I ran that on the outside track, and my WSOR engines with a mixed load of my very picky freight cars on the inside track, WOW, they BOTH ran around the layout WITHOUT FAIL!
I should have taken pics of the event, but of coarse I didnt even think about it until I started running other stuff , at least now I can run trains again, YEAH! Now I can get back to my 1000 other projects the layout needs done. Not sure what I will start with, I have so many engines and cars that need couplers replaced, light bulbs replaced, hand rails fixed, sunshades put back on, ect. , OR, I might start building scenery stuff, like billboards, etc. , so much to do .
A couple pics from today...
Till next time....
-Deano