Waiting during switching
#11
Ed:A small ISL doesn't need to incorporate switching puzzles in its design in order to make the layout seem larger.
--------------------------
Right there is a topic heading and one that should get modelers to think outside the old worn switching layout design box and away from anything that resembles a time saver..

As many car spots as I have planed for Slate Creek I figure 40-45 minutes or using a time ratio of 15:1 3 scale hours which may be a tad to fast for the amount of work..
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)