L&M Rocky Mountain Pass
#51
wgrider Wrote:Ok so the new river has been cutout and I managed to get a very long piece of plywood in place ( this wasn't easy ). I sealed off the edges with silicone as I will be using envoritex and if it were to leak it would be a catastrophe destroying the lower staging. I'm not sure what I'm doing with the upper half of the river pertaining to its length , I'm also thinking of trying the ground goop for the river banks to achieve the needed texture for ground fall, any suggestions obviously appreciated?

[Image: img0424vj4.th.jpg]

Just in case you missed a pinhole somewhere, it might be a good idea to get a plastic tarp or plastic sheet and cover the lower level staging yard before you do the pour.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)